CANUS
A PortaDC pod at sunset on a solar farm with a wind turbine behind

CANUS/PortaDC™

The AI factory that ships.450 kW to 1.2 MW per pod.

Factory-built, liquid-cooled AI factories in two hulls. Owned by CANUS, leased to you by the IT-kW on sites that already have power and fibre. 120-day target from order.

Host a pod

01Why PortaDC

01 / 08

01Why PortaDC01 / 08

Built fora different decade.

The concrete hall against the pod, on the four numbers that decide the build.

1/6th
Build cost per MW
120 days
Target to powered racks
0 L
Evaporative water after fill
12–21%
Under Sydney metro, all-in
A crane lowering the cooling module onto a PortaDC vault at a wind and solar site

Lifted in.Not built on site.

120 days
Target from order to powered racks
450 kW to 1.2 MW
Per pod
02The hulls02 / 08

Two hulls.One 450 kW block.

Compute below, heat rejection above. One block in the 20 ft PortaDC20, two in the 40 ft PortaDC40.

PortaDC20 two-module stack

20-ft · 450 kW IT

20-foot high-cube ISO two-module stack

PortaDC20

Built for 3 to 5 high-density direct-to-chip racks (80 to 130+ kW/rack)

Dimensions
6,058 × 2,438 × 2,896 mm lower vault + matching 6,058 mm rooftop heat-rejection module
Rack capacity
3 to 5 direct-to-chip liquid racks at 80–130+ kW/rack (+1 network/control bay)
Ideal hardware
NVIDIA GB200/GB300 NVL72, dense HGX B200/B300 & H200 liquid clusters
Cooling plant
Redundant N+1 liquid cooling · thermal buffer · precision air trim
Electrical
One 415 V AC bay · ties into existing solar, BESS or industrial switchboards
Logistics
Truck delivery · two-module lift and lock on a ready pad
03Inside03 / 08

One hull. Three systems.

Compute below, heat rejection above, and three systems running through both.

Hull

System

  • Cool supply
  • Warm return
DWG CANUS·PDC20·S01
TENANTHOST6,058 MM2,896 MM
PortaDC20 · 20 ft · 450 kW ITCANUS TECHNOLOGIES
  1. 01

    Cooling

    Liquid to the chip in a closed loop. Heat goes to air on the roof. No evaporative water after fill.

  2. 02

    Power

    415 V from a site that already has it, metered at the boundary and held there by FrontierGate™.

  3. 03

    Record

    Power in and heat out, hardware-signed by LARUS AI™ into one record the tenant and the host both read.

04The leases04 / 08

Pulse. Surge. Forge.

Three leases on the same pod. Each is three numbers: a firm floor, a cushion and a flexible band.

  • PortaDC Pulse™

    01 · 24/7 firm production inference

    PortaDC Pulse™

    The 24/7 live inference & decode pod. Firm floor plus cushion. Flexible band: zero. Never trimmed.

    • Real-time token streaming
    • Live voice, support and clinical agents
    • On-demand image and video APIs

    Target rent, power at cost

    US$165–172 (A$235–245) per IT-kW-month

  • PortaDC Surge™

    02 · Elastic batch, 25 to 40% contracted flex

    PortaDC Surge™

    The solar-sponge prefill, RAG & batch pod. Firm floor plus cushion plus a contracted 25 to 40% flexible band, tenant-run.

    • Long-context prefill and cache pre-warming
    • Medical imaging, genomics and radiology batch
    • Bulk rendering, synthetic data and enterprise RAG embeddings

    Target rent, power at cost

    US$140–155 (A$200–220) per IT-kW-month

  • PortaDC Forge™

    03 · Firm, dense training

    PortaDC Forge™

    The dense training & fine-tuning pod. Firm, dense liquid at 80 to 130 kW a rack.

    • Foundation model post-training and domain fine-tuning
    • Dense-rack expansion for neoclouds
    • Air-gapped on-site sovereign vaults

    Target rent, power at cost

    US$180–187 (A$255–265) per IT-kW-month

Inside the pod

Compute and cooling,built as one.

Every PortaDC is a complete 450 kW to 1.2 MW AI facility in one shell. Racks, liquid cooling, 415 V power and controls are designed, built and tested together before the pod leaves the factory.

450 kW ITLiquid-cooled to the chipClosed loopFactory-tested and recorded

You bring the GPUs. We bring the powered pod.

The engineering view

01 / 06 · Two modules. One machine.

Inside the pod · 1 min 56
06The brain06 / 08

The brain inside every pod.

A rack-mounted unit in every pod. FrontierGate™ holds the boundary; LARUS AI™ signs what crossed it.

The FrontierGate boundary controller: a rack-mounted unit with the FrontierGate mark on its face
  1. 01The cushion, executed at the boundary

    5:00 PM host load spike

    • Host boundary: held
    • Tenant firm floor: unchanged
    • Pulse racks trimmed: never
  2. 02The buffer carries the cushion

    45 °C summer afternoon

    • Supply coolant: at or below 35 °C
    • Design ambient: 45 °C · survival 50 °C
    • Evaporative water: none after fill
  3. 03Two channels, hardware-signed

    The LARUS AI operating record

    • Boundary power // Hardware-signed
    • Thermal delivery // Hardware-signed
    • Fault isolation // Independent, hardware
07Security07 / 08

Designed for 45 °C. Survives 50 °C.

Four layers, from the fence line to the certificate.

  1. 01

    Fenced, monitored switchyard perimeter

    Sited inside fenced, 24/7 monitored solar-and-battery switchyards or secured industrial premises. No public foot traffic.

  2. 02

    Windowless weathering-steel armour (IP55)

    Solid corrugated weathering-steel walls with no air-intake louvres, internal deadbolts, vibration sensing and clean-agent fire detection and suppression to Australian standards.

  3. 03

    One signed record, one fault trip

    LARUS AI™ hardware-signs boundary power and thermal delivery into one auditable ledger. Tamper-linked telemetry and independent hardware fault isolation sit alongside.

  4. 04

    Factory-tested. Certified in Australia.

    Every pod passes witnessed factory acceptance testing before it ships, then Australian integration and certification: AS/NZS 61439 switchboard, revenue-grade boundary metering, fire detection and suppression to Australian standards, statutory AS/NZS 3000 certification and site acceptance sign-off.

08Economics08 / 08

Bring your GPUs. Lease the capacity.

Target rent per IT-kW-month, power passed through at cost · US$ first, A$ beside

  • PortaDC Surge™

    Elastic batch and prefill. 25 to 40% contracted flex, tenant-run.

    Rent, US$ (A$)
    140 – 155 (A$200 – 220)
    All-in with power, US$
    ~182
    vs Sydney metro US$270
    33% under
  • PortaDC Pulse™

    24/7 firm production inference. Flexible band: zero.

    Rent, US$ (A$)
    165 – 172 (A$235 – 245)
    All-in with power, US$
    ~213
    vs Sydney metro US$270
    12 to 21% under
  • PortaDC Forge™

    Dense training. Firm liquid racks at 80 to 130 kW.

    Rent, US$ (A$)
    180 – 187 (A$255 – 265)
    All-in with power, US$
    ~236
    vs dense hall US$311
    24% under

Six numbers that decide the build.

Metro data centrePortaDC
Build cost per MW (excl. GPUs)About 6× the podAbout 1/6th of a metro hallFactory-built pod on a ready pad
Time to powered racksYears120 daysTarget deployment from order, on existing 415 V boards
PowerMetro tariffBehind-the-meter renewable and hybrid tariffsPassed through at cost under transparent site schedules (shared under NDA)
Rack density supported10 – 25 kW / rack35 – 130+ kW / rackForge 80 – 130 kW, direct-to-chip liquid
Water consumptionMillions of litres / yearNo evaporative water after fillClosed-loop liquid, rooftop dry cooler
All-in monthly cost~US$270 / IT-kW / month~US$213 / IT-kW / monthPulse target rent + power at cost · 12 to 21% under

Indicative figures, confirmed in each lease. Power figures are planning blends, not a host tariff. Enquiries do not quote prices or reserve inventory.

Reserve capacity or host a pod

Deploy a pod.

Three ways in. Pick your track; a named person replies within one business day. Enquiries do not quote prices or reserve inventory.

Up next

Inside the pod→